Thursday, April 12, 2012

Library Utilities













We drew utility lines on our library.

We learned some stuff that could be handy in some sort of future event or activity.







Tuesday, March 27, 2012

Beam Design





















We calculated beam stuff.

It Was Different. I learned alot of stuff.







Thursday, March 15, 2012

3.2.3







We evaluated the loads the pis provide for beam diagrams.

This project was fun because i really like math in engineering. (rather do math than look stuff up in online books like the past activities.)



Thursday, March 8, 2012

Title of post: Keystone Library - Roof Framing







We chose beams for our library based on design loads.

I learned alot about planning beams for buildings and structures.



Wednesday, February 29, 2012

Keystone Library – Project 3.1.1

























This project was fun because it was preety open to creativity. We were given a library and told to turn it into a library with certain constrainsts such as it must contain 2 conference rooms, 1 bathroom on each floor. etc..
























Monday, February 27, 2012

Structural Activity




For this project we had to design and build a card tower that needed to be 8 inches tall and be able to hold 5 pounds. We came in second place. Our tower held 5407 grams and had an efficiency rating of 215. In our original structure we only had an efficiency rating of 40.87. So for our design renovations we change the whole design. Instead of triangles we used a circle with cards inbetween for support. 5407 / 25.1 = 215


Structural Activity

Friday, February 17, 2012

Commercial Floor Systems



We researched concrete floors and how to evaluate the size and thickness. Then we added it to the keystone building. I chose cast in place concrete with a thickness of 8".


This project was fast and easy. I feel like i learned alot about concrete.


Friday, February 10, 2012

Comercial Roof Systems





















We researched materials and styles of roofs for our library. We then applied a roof to the building. One green and walkable, the other low sloped.





I found that EPDM does support the weight of a garden at http://roofingdoctor.net/rub2.htm. From this site i learned two of my options for a walkable roof were either EPDM or concrete. I chocse EPDM because it is cheaper.





It was nice to see the building start to come together. It was easy to see the application of learning this.









Tuesday, February 7, 2012

Commercial Wall Systems




in this project we researched the advantages and disadvantages of different wall types in order to decide what wall is beat for the library.


This project was nice because it was constructive, but it was to the point and quick.


Wednesday, January 18, 2012

Plumbing plan



We took our floor plan from our affordable house and drew a plumbing plan.

This project was a brief illustration of a plumbing plan. It could have been way more in depth.


Wednesday, January 11, 2012

Affordable House Cite plan



We created a site plan for the house we made in a previous project.


This project was interesting in that we learned some of the norms for site planning.

Wednesday, January 4, 2012

Daylighting









We revised our allready made affordable houses to include electricity and daylighting (skylights/windows)

In this project i learned codes about outlets and lights. For te first time i had to consider lighting in a house i made.